The phrase fire rated door assembly is important because a rating belongs to a documented configuration, not to a loose collection of components. Product selection and site installation must both follow the intended configuration.
The components are connected
The leaf, frame, hinges, closer, latch, glazing, seals and wall interface all affect how the opening functions. A compatible component is not necessarily an approved substitute in every assembly.
Use the door schedule as the control document
A well-prepared schedule carries the rating, opening dimensions, handing, wall type, hardware and special requirements. It gives the architect, contractor, distributor and manufacturer one shared reference.
- Opening mark and location
- Performance requirement
- Leaf and frame construction
- Hardware preparation
- Glazing, louver and finish information
Document changes before fabrication or installation
If hardware, glass, frame profile or opening dimensions change, review the impact before parts are made or altered in the field. This is faster and safer than attempting to solve a conflict after delivery.
Project information to send
- Opening schedule and life-safety drawings
- Wall construction and frame dimensions
- Hardware, glazing and access-control requirements
- Required labels, certification and delivery documents
Selections must be verified against the adopted code, project specification and listed assembly for the exact opening. For an opening-level review, send the schedule through Get a Quote.